Protection Coordination & Data Review – STAG Central Production Facility
Execution Period:
July 2024
Main Contractor:
Sigma Power Services
Facility
STAG Central Production Facility (Offshore Platform)
Location
Stag Field, Western Australia
Scope of Services
Technical Solutions & Services carried out protection coordination and technical data review for low-voltage switchgear and SIMOCODE motor protection relays installed at the STAG Central Production Facility. The scope included review of electrical system data and single-line diagrams, verification of MCCB ratings and protection settings, assessment of short-circuit levels and equipment adequacy, and coordination review between upstream and downstream protective devices. The study also involved development and validation of the electrical network model using ETAP to support load flow, short-circuit, and protection coordination assessments in accordance with relevant international standards.
Project Details
- End User: Jadestone Energy Australia Pty Ltd
- Subcontractor: Technical Solutions & Services, Lahore, Pakistan
- Field: Stag Field, Western Australia
Completed and Accepted
Main Services
Arc Flash Hazard Assessment (Initial & Revised) – Mt Weld Power Station
Arc Flash Hazard Assessment (Initial & Revised) – Mt Weld Power Station
Risk Assessment & Mitigation Study – Southern Seawater Desalination Plant (Australia)
Multi-Phase Electrical System Studies – Dampier EII HV Network
Multi-Phase Electrical System Studies – Dampier EII HV Network