Bore Pump Control Panel Design – Rio Tinto

Execution Period:

September 2025

Main Contractor:

International Commissioning Solutions Group Pty Ltd

Scope Item:

Bore Pump Control Panels (9.5 kW and 5.5 kW)

Location

Western Australia

Scope of Services

Technical Solutions & Services prepared electrical control panel design schematics for 9.5 kW and 5.5 kW bore pump installations, including associated booster pump control. The scope included development of control and wiring diagrams with soft starter control, tank level and pressure switch interfacing, provision for dry-run protection, and preparation of a Bill of Materials (BoM) with component specifications and ordering details.

Projects Details

  • End User: Rio Tinto
  • Subcontractor: Technical Solutions & Services, Lahore, Pakistan
  • Scope Item: Bore Pump Control Panels (9.5 kW and 5.5 kW)
Status:

Completed and Accepted.