Arc Flash, Protection & Short-Circuit Study – BHP Nickel West Kwinana Refinery (Australia)
Date
June 2025
Main Contractor:
Sigma Power Services
Facility
BHP Nickel West – Kwinana Nickel Refinery
Location
East Rockingham and Kwinana Beach, Western Australia
Scope of Services
Technical Solutions & Services executed a Power System Short-Circuit Analysis, Protection Coordination Study, and Arc Flash Hazard Assessment for the electrical distribution system of the BHP Nickel West Kwinana Nickel Refinery. The scope covered in-service electrical networks from 11 kV down to 415 V, including substations, switchboards, MCCs, and associated feeders. The services were delivered as a subcontractor to Sigma Power Services and included development and validation of the electrical network model in DIgSILENT PowerFactory, calculation of short-circuit fault levels in accordance with IEC 60909, review and coordination of protection relay settings, and arc flash hazard analysis in line with IEEE 1584. The assessment considered multiple operating and contingency scenarios to determine arc flash boundaries, incident energy levels, and applicable PPE categories in accordance with relevant international standards
Project Details
- End User: BHP
- Main Contractor: Sigma Power Services
- Subcontractor: Technical Solutions & Services (TSS), Lahore, Pakistan
- Facility: BHP Nickel West – Kwinana Nickel Refinery
- Location: East Rockingham and Kwinana Beach, Western Australia
- Execution Period: June 2025
Completed
Main Services
Arc Flash Hazard Assessment (Initial & Revised) – Mt Weld Power Station
Arc Flash Hazard Assessment (Initial & Revised) – Mt Weld Power Station
Risk Assessment & Mitigation Study – Southern Seawater Desalination Plant (Australia)
Multi-Phase Electrical System Studies – Dampier EII HV Network