Arc Flash Hazard Assessment – Electrolyser Facility (GEM)
Execution Period:
March 2025
Main Contractor:
Sigma Power Services
Facility
GEM Center – Phase 1
Location
Gladstone, Queensland, Australia
Scope of Services
Technical Solutions & Services executed an Arc Flash Hazard Assessment for the low-voltage electrical installation of the Phase-1 Electrolyser Facility at the Green Energy Manufacturing Center (GEM). The scope included review of electrical system data, development and validation of the electrical network model using DIgSILENT PowerFactory, assessment of worst-case operating and fault scenarios, and determination of arc flash boundaries, incident energy levels, and applicable PPE categories in accordance with relevant international standards.
Project Details
- End User: Fortescue Future Industries
- Main Contractor: Sigma Power Services
- Assessment of worst-case operating and fault scenarios
- Subcontractor: Technical Solutions & Services (TSS), Lahore, Pakistan
- Facility: Electrolyser Facility – Phase 1, Green Energy Manufacturing Center (GEM)
- Location: Gladstone, Queensland, Australia
Completed and Accepted
Our Projects
Arc Flash Hazard Assessment – Offshore Oil Drilling Rig (Australia)
Arc Flash Hazard Assessment – BHP Perth Repair Centre (Australia)
Arc Flash, Protection & Short-Circuit Study – BHP Nickel West Kwinana Refinery (Australia)
Arc Flash Hazard Assessment – Electrolyser Facility (GEM), Fortescue Future Industries (Australia)
Protection Coordination & Data Review – STAG Central Production Facility (Offshore, Australia)
Multi-Phase Electrical System Studies – Dampier East Intercourse Island (EII) HV Network, Rio Tinto (Australia)
Risk Assessment & Mitigation Study – Southern Seawater Desalination Plant (Australia)
Arc Flash Hazard Assessment (Initial & Revised) – Mt Weld Power Station, Australia
Multi-Phase Electrical System Studies – Dampier East Intercourse Island (EII) HV Network, Rio Tinto (Australia)
Bore Pump Control Panel Design – Rio Tinto (Australia)