Bore Pump Control Panel Design – Rio Tinto
Execution Period: September 2025 Main Contractor: International Commissioning Solutions Group Pty Ltd Scope Item: Bore Pump Control Panels (9.5 kW and 5.5 kW) Location Western Australia Scope of Services Technical Solutions & Services prepared electrical control panel design schematics for 9.5 kW and 5.5 kW bore pump installations, including associated booster pump control. The scope […]