Bore Pump Control Panel Design – Rio Tinto
Execution Period:
September 2025
Main Contractor:
International Commissioning Solutions Group Pty Ltd
Scope Item:
Bore Pump Control Panels (9.5 kW and 5.5 kW)
Location
Western Australia
Scope of Services
Technical Solutions & Services prepared electrical control panel design schematics for 9.5 kW and 5.5 kW bore pump installations, including associated booster pump control. The scope included development of control and wiring diagrams with soft starter control, tank level and pressure switch interfacing, provision for dry-run protection, and preparation of a Bill of Materials (BoM) with component specifications and ordering details.
Projects Details
- End User: Rio Tinto
- Subcontractor: Technical Solutions & Services, Lahore, Pakistan
- Scope Item: Bore Pump Control Panels (9.5 kW and 5.5 kW)
Completed and Accepted.
Our Projects
Arc Flash Hazard Assessment (Initial & Revised) – Mt Weld Power Station
Arc Flash Hazard Assessment (Initial & Revised) – Mt Weld Power Station
Risk Assessment & Mitigation Study – Southern Seawater Desalination Plant (Australia)
Multi-Phase Electrical System Studies – Dampier EII HV Network