Arc Flash Hazard Assessment (Initial & Revised) – Mt Weld Power Station

Execution Period:

March 2025 (Initial Study) & August 2025 (Revised Study)

Main Contractor:

International Commissioning Solutions Group Pty Ltd

Facility

KPS Mt Weld Power Station – Generator Distribution System

Location

Goldfields Region, Western Australia

Scope of Services

Technical Solutions & Services executed an Arc Flash Hazard Assessment for the 415 V Generator Distribution Board at the Mt Weld Power Station, followed by a revision of the assessment to address updated operating conditions and verification requirements. The scope included review of electrical system data, development and validation of the power system model using ETAP, assessment of worst-case operating and fault scenarios, and determination of arc flash boundaries, incident energy levels, and applicable PPE categories in accordance with relevant international standards.

Scope of Services & Technical Milestones

  • End User: Lynas Rare Earths Ltd. (Mt Weld Operations)
  • Subcontractor: Technical Solutions & Services (TSS), Lahore, Pakistan
  • Location: Goldfields Region, Western Australia
Status:

Completed and Accepted